Certification Process
时间:2023-08-10 访问量:444

Certification process:

 

1. Submit an application form

2. Select samples to be sent to an authorized ECO laboratory for initial type testing

3. After passing the test, the CPD engineer carries out certification work and issues a product certification certificate

Note: The testing cycle for doors and windows is 10 working days. After the test is passed and the customer submits complete documents, our company can issue the certificate within 20 working days.

 

ITT test:

-Air permeability and airtightness

Norm: Based on EN 1435:1997+A1:2002,EN 1026:2000, EN 12207:1999

 

-Water resistance and water tightness

Norm: Based on EN 14351-1:2006+A1:2010, EN 1027:2000, EN 12208:1999

 

-Wind loading resistance to wind pressure

Norm: Based on EN 14351-1:2006+A1:2010, EN 12211:2000, 12210:1999/AC:2002

 

-Thermal transmission value

(By means of calculation through BISCO software)

Norm: Based on EN 14351-1:2006+A1:2010, EN ISO 10077-2:2003

 

-Acoustic measurement of sound insulation

(By means of laboratory tests measured in the laboratory)

Norm: Based on EN 14351-1:2006+A1:2010, EN ISO 140-3

 

-Acoustic measurement of sound insulation

(By means of calculation - max. assessment 38 dB - maximum value of 38 dB through calculation)

Norm: Based on EN 14351-1:2006+A1:2010, EN ISO 140-3

 

-AntiBurglar anti-theft performance

Norm: Based on EN 14351-1,EN1627,EN1628,EN1629, EN1630

 

Our company has also launched the FPC certification project for building product directives.

 

The FPC certificate is subject to production control by the producer, and all requirements and terms adopted by the producer must be archived in a systematic and formal manner in the factory. Production control refers to controlling whether all links from raw materials to the final product meet the standard requirements.

Certification process:

 

1. Send engineers to the enterprise for factory inspection and guide the enterprise to carry out rectification (Send engineer to manufacturer to perform factory check, help manufacturer to improve);

2. Assist manufacturers in compiling FPC documents for enterprises;

3. Issue certificate within 20 working days after completion of compiling the FPC documents